Universal sports hall
Glulam trusses, one court with markings for three sports and concreted post sleeves.
See the drawing →The association was founded on 11 December 2025. We are building a sports complex in Madliena — a place to train, to stay and to recover. All surplus goes back into the complex.
A 110 m² gym with an annex for changing rooms and showers, a 75 m² studio and three cabins. Active construction — paths, terraces and grounds.
A timber glulam hangar 20 × 20 × 8 m, one court with changeable markings. Architecture is already starting.
One barn, 948 m² net — spa, restaurant/event hall and offices. Visualisations plus a pond for swimming and outdoor water activities.
Stage 2 has a drawing, stage 3 a scheme with areas. The final solution will be set by the architect.
Glulam trusses, one court with markings for three sports and concreted post sleeves.
See the drawing →One barn: spa with pool hall, restaurant/event hall, offices. Together with a pond for outdoor water activities.
See the scheme →